Building Set Out

Last Friday, the building set-out was completed. This means that the site has many, many pegs on it now. For each wall-section there are two pegs, with a nail in the top, marking the external line of brickwork. To make this useful for the excavation of footings, string-lines are run between pegs, and the ground marked with the paint or chalk beneath the string line.