High Pressure Sewer

The service provider for the sewer system has given us a verbal agreement that they can connect out proposed house to the system. The Building Surveyor said that he needed this confirmation before he can sign-off on the Building Permit. So its good news. We should get written advice in about a week, hopefully with some info about where the connection point would be, and what on-site infrastructure is required (e.g. macerating pump, one-way fail-safe valves etc.)