The plasterboard hangers were scheduled for early November, but I had to delay them by one-week when I realised that I was not going to have the frame ready for them.
So the plasterboard was installed by a team of three "hangers" around November 10. They took three days to do it (they said thyy would have taken two days on a normal house, but our 12-foot ceilings slowed them down).
They did a great job, and put all the off-cuts into a bin that I had arranged for them.
So the plasterboard was installed by a team of three "hangers" around November 10. They took three days to do it (they said thyy would have taken two days on a normal house, but our 12-foot ceilings slowed them down).
They did a great job, and put all the off-cuts into a bin that I had arranged for them.